Problem:
During the remodel of the Meadowlark Hills retirement complex,
Scott Coon of KBS Constructors contacted Construction Solutions
to to locate conduits prior to flat sawing for new trenches.
Solution:
Prior to Construction Solutions arriving at the jobsite the
contractor cleared the area of debris and laid out the area
requiring the conduit locates. The results of the scanned
area showed 4 conduits running directly at the bottom of the
slab with no cover. After marking out location and depths
of the conduit and the bottom of the slab KBS contracted a
concrete cutter to trench out the concrete. Scott with KBS
then contacted Construction Solutions informing us that the
layout of the GPR technician "Couldn't have been more
accurate". The location of the 4 conduits saved expensive
repairs that would have been the result if the conduits were
not located with GPR.
|