Case Studies:
Rebar - Conduit
- Tension Cables - Inspections
- Utilities - Voids
Leaks - Bridges
- USTs - Graves
- Geophysical - Lakes/Rivers
 |
| During renovation at Arrowhead
Stadium, structural steel contractors constructed new
beams for the new, much larger walkways. Prior to inspection
of the structural steel contractors poured concrete into
the forms. See how GPR was able to perform the inspection
and provide information to the inspector to approve the
new concrete beams. |
 |
| Construction Solutions offered precise documentation
of the construction of the Coralville, IA parking garage.
Using GPR to scan the entire garage in 3D, we were able
to show contractors the exact depths of rebar mats and
thickness of the slab. See how the results turned out. |
 |
| Bartle Hall, located in the heart of Kansas City, MO,
has worked to remodel the loading dock on the north end
off of 12th Street. Soon after pouring concrete, noticeable
settling was evident after water pooled on the surface.
Construction Solutions was used to perform an investigation
as to how this settling was occurring. See the results
of our findings. |
 |
| As our cell phone network continues to expand engineers
are trying to figure out "How much more can we add
to this existing tower?" Many towers do not have
enough detailed information about the concrete pier construction
to answer this question. See how we are able to use GPR
to gather information for engineers so they can determine
if a tower can sustain more equipment. |
|