Construction Solutions
Construction Solutions Homepage






Construction Solutions
Case Studies
Princeton Plasma Physics Lab
RWE Nukem Corporation
Cleveland Bridge
Sonsub
PCG, Inc.
BNFL and Consumers Energy
Home
Job Locations
Professional Consulting

Engineering and Design for Princeton Plasma Physics Laboratory

Princeton Plasma Physics Laboratory (PPPL) contracted Construction Solutions to provide consulting engineering and design review services for the Tokamak Fusion Test Reactor (TFTR) Vacuum Vessel Removal. The removal of this test reactor was centered on special steel cutting diamond wire and wire sawing techniques. A mock up of the reactor was built. It was then cut with a modified wire saw and special purpose diamond wire in order to test the feasibility of this method. Construction Solution's wire sawing method met the entire design criterion necessary. It was also specified as the method of choice for the next phase of the project.



Princeton

Princeton

Construction Solutions

HOME

Ground Penetrating Radar | Professional Consulting | Precision Demolition
Decommissioning | Rehabilitation

About Construction Solutions | Contact Us / Request Info | Additional Resources

Produced & Developed by Digital Lagoon